Carlton Baths

The Carlton Baths Redevelopment in Melbourne involved the renovation of an existing 25m pool as well as the construction of a new Children’s Pool complete with water features and a slide activity centre. The facility utilises and on-sire offline chlorine generation system, carbon dioxide for pH control and high rate sand filtration.

Client: [cf-client]

Location: [cf-location]

Scope of Works

  • Development of design concept drawings by others to a complete coordinated buildable design.
  • Production of shop drawings for swimming pool construction contractor.
  • Generation of electrical design criteria specifications and as-constructed drawings.